- Mobile Medical Waste Disposal Equipment
- Centralized Medical Waste High Temperature Steam Treatment Equipment
- Animal Tissue (Residue) Treatment Equipment
- VOC Exhaust Treatment Equipment
- Desulfurization Equipment
- Skid-Mounted Liquefaction Equipment
- Purification Equipment
- Liquefaction Plant
- Truck-Mounted Skid-Mounted Liquefied Natural Gas Plants
- Non-Standard Pressure Vessel
- Natural Gas Treatment Plant Tail Gas Recovery Equipment
China Liquefaction Plant Life Cycle Solutions by Leading Suppliers for Efficient Factory Construction and Operation
EPC General Engineering Contracting
Modularised equipment matrix
Intelligent Engineering Management System
Operation and maintenance support around the clock
Deploying intelligent IOT operation and maintenance platform, real-time monitoring of 200+ equipment operation parameters, fault warning accuracy rate of 92%. Equipped with 20 professional on-site teams, we commit to a 2-hour emergency response mechanism, provide value-added services such as spare parts supply, process optimisation, energy efficiency improvement, etc., to guarantee the annual running time of the plant ≥ 8,000 hours.
We have successfully delivered 30+ liquefaction plant projects, with a cumulative liquefaction capacity of more than 5 million m3/d. We have helped our customers to reduce their operating costs by 15% through our full value chain services, and built the core competitiveness of the clean energy industry.
Frequently Asked Questions
How does the 3D collaborative design platform benefit EPC projects?
Our unique 3D collaborative design platform shortens the overall construction cycle by 30% and ensures a high project acceptance rate of 98% through precise digital delivery and full-process control.
What is the daily processing capacity of your modularised liquefaction equipment?
We offer a comprehensive range of liquefaction equipment utilizing self-developed MRC hybrid refrigeration and BOG re-condensation packages, supporting daily processing capacities from 1,000 to 500,000 m³ per day.
How much installation time is saved by using skid-mounted modules?
By adopting factory prefabricated skid-mounted modules, we achieve a pre-installation rate of 85% for key equipment, which shortens the on-site construction cycle by 60% compared to traditional installation methods.
What safety measures are integrated into your Intelligent Engineering Management System?
Our "5G+AI" system features a triple protection framework including personnel positioning, real-time equipment status monitoring, and risk early warning, contributing to over 2 million cumulative safe working hours.
What are your response times and commitments for operation and maintenance?
We commit to a 2-hour emergency response mechanism backed by 20 professional on-site teams. Our intelligent IoT platform monitors over 200 parameters to guarantee a plant annual running time of at least 8,000 hours.
What is your track record in delivering clean energy projects?
We have successfully delivered over 30 liquefaction plant projects globally, achieving a cumulative liquefaction capacity exceeding 5 million m³/d and helping clients reduce overall operating costs by 15%.
Inquire Now!
If you have any needs, please feel free to contact me and I will be happy to serve you.

