- Mobile Medical Waste Disposal Equipment
- Centralized Medical Waste High Temperature Steam Treatment Equipment
- Animal Tissue (Residue) Treatment Equipment
- VOC Exhaust Treatment Equipment
- Desulfurization Equipment
- Skid-Mounted Liquefaction Equipment
- Purification Equipment
- Liquefaction Plant
- Truck-Mounted Skid-Mounted Liquefied Natural Gas Plants
- Non-Standard Pressure Vessel
- Natural Gas Treatment Plant Tail Gas Recovery Equipment
0102030405
China Skid-Mounted Liquefaction Equipment Suppliers | LNG Technology from Leading Factory
Detailed Description
Skid-mounted natural gas liquefaction system adopts modular integration technology, integrating pre-treatment and pressure regulation, deep purification, hybrid refrigeration and liquefaction as well as intelligent storage and transportation, and the core unit is highly integrated through standardised skid blocks (12m×3m×3.5m). For the scenario of daily processing capacity of less than 30,000 cubic metres, the first compressor and cold box integrated design eliminates the on-site refrigerant pipeline connection, reducing the risk of leakage by 90%, and the overall system occupies 40% less space than traditional equipment. Through the flexible combination of 3-6 standard skids, the system can be expanded to 300,000 m3/day processing capacity, which is suitable for the development of marginal gas fields, shale gas wells and other decentralised gas sources.
The system covers five major application dimensions:
Dynamic peaking of urban gas pipeline network
Resource utilisation of associated gas from oil fields
Recovery of scattered gas from remote gas wells
Efficiency improvement of unconventional gas such as coal bed methane/biogas
Low-carbon conversion of industrial tail gas
The core technology adopts a three-stage process chain: molecular sieve double-tower dehydration to make the gas dew point ≤ -70℃, nitrogen-methane cascade refrigeration to optimise the energy consumption by 18%, and BOG recondensation technology to ensure the liquefaction rate of more than 98%.
Core Advantages
The core advantages are embodied in the ‘four poles’ characteristics:
Extremely simple deployment
Factory pre-installation rate of 95%, on-site within 7 days to complete the group skid.
Extremely Intelligent Operation and Maintenance
5G Internet of Things (IoT) platform for remote control and energy efficiency monitoring.
Extremely fast response
2-4 months delivery cycle, 60% shorter than traditional model.
Extreme Return
Modular expansion reduces marginal cost, payback period <24 months.
Applicable to projects processing 1-100,000 tonnes of LNG per year, it has become an efficient mobile solution in the field of distributed gas source development.
Frequently Asked Questions (FAQ)
What is the processing capacity range of the skid-mounted natural gas liquefaction system?
The system is highly flexible and scalable. Through the combination of 3-6 standard modular skids, the daily processing capacity can be expanded up to 300,000 cubic metres. It is ideally suited for projects processing 1-100,000 tonnes of LNG per year.
How does the system achieve a 90% reduction in refrigerant leakage risk?
For processing capacities under 30,000 cubic metres per day, the system features an integrated design of the first compressor and cold box. This setup completely eliminates the need for on-site refrigerant pipeline connections, reducing potential leakage risks by 90%.
What are the primary applications of this modular liquefaction system?
The system is designed for five key dimensions: dynamic peaking of urban gas pipelines, resource utilisation of oil field associated gas, recovery of scattered gas from remote wells, efficiency improvement of unconventional gas (like coal bed methane/biogas), and low-carbon conversion of industrial tail gas.
What core technologies are used to optimize energy consumption and liquefaction rates?
The system utilizes a three-stage process chain: molecular sieve double-tower dehydration (keeping gas dew point ≤ -70℃), nitrogen-methane cascade refrigeration (improving energy consumption by 18%), and BOG recondensation technology (achieving a liquefaction rate of more than 98%).
How fast can this skid-mounted system be deployed and operational?
With a factory pre-installation rate of 95%, the system can be fully assembled on-site within just 7 days. Additionally, the delivery cycle is only 2-4 months, which is 60% shorter than traditional models, leading to a payback period of less than 24 months.
Inquire Now!
If you have any needs, please feel free to contact me and I will be happy to serve you.

