- Mobile Medical Waste Disposal Equipment
- Centralized Medical Waste High Temperature Steam Treatment Equipment
- Animal Tissue (Residue) Treatment Equipment
- VOC Exhaust Treatment Equipment
- Desulfurization Equipment
- Skid-Mounted Liquefaction Equipment
- Purification Equipment
- Liquefaction Plant
- Truck-Mounted Skid-Mounted Liquefied Natural Gas Plants
- Non-Standard Pressure Vessel
- Natural Gas Treatment Plant Tail Gas Recovery Equipment
0102030405
China Suppliers Factory for Skid-Mounted LNG Liquefaction Equipment for Natural Gas and Shale Gas
Detailed Description
Skid-mounted natural gas liquefaction system adopts modular integration technology, integrating pre-treatment and pressure regulation, deep purification, hybrid refrigeration and liquefaction as well as intelligent storage and transportation, and the core unit is highly integrated through standardised skid blocks (12m×3m×3.5m). For the scenario of daily processing capacity of less than 30,000 cubic metres, the first compressor and cold box integrated design eliminates the on-site refrigerant pipeline connection, reducing the risk of leakage by 90%, and the overall system occupies 40% less space than traditional equipment. Through the flexible combination of 3-6 standard skids, the system can be expanded to 300,000 m3/day processing capacity, which is suitable for the development of marginal gas fields, shale gas wells and other decentralised gas sources.
The system covers five major application dimensions:
(1)
dynamic peaking of urban gas pipeline network;
(2)
resource utilisation of associated gas from oil fields;
(3)
recovery of scattered gas from remote gas wells;
(4)
efficiency improvement of unconventional gas such as coal bed methane/biogas;
(5)
low-carbon conversion of industrial tail gas.
The core technology adopts a three-stage process chain: molecular sieve double-tower dehydration to make the gas dew point ≤ -70℃, nitrogen-methane cascade refrigeration to optimise the energy consumption by 18%, and BOG recondensation technology to ensure the liquefaction rate of more than 98%.
Core Advantages
The core advantages are embodied in the ‘four poles’ characteristics:
Extremely simple deployment
factory pre-installation rate of 95%, on-site within 7 days to complete the group skid;
Extremely Intelligent Operation and Maintenance
5G Internet of Things (IoT) platform for remote control and energy efficiency monitoring;
Extremely fast response
2-4 months delivery cycle, 60% shorter than traditional model;
Extreme Return
modular expansion reduces marginal cost, payback period <24 months.
Applicable to projects processing 1-100,000 tonnes of LNG per year, it has become an efficient mobile solution in the field of distributed gas source development.
Frequently Asked Questions
Q1: What is the processing capacity of the skid-mounted natural gas liquefaction system?
A1: The system is ideal for daily processing capacities under 30,000 cubic meters. Through flexible combinations of 3-6 standard skids, the capacity can be scaled up to 300,000 cubic meters per day.
Q2: How does the system reduce space and leakage risks?
A2: By utilizing an integrated design for the compressor and cold box, it eliminates the need for on-site refrigerant pipeline connections. This reduces leakage risks by 90% and decreases the overall space footprint by 40% compared to traditional setups.
Q3: What are the main application areas for this skid-mounted system?
A3: The system covers five key areas: urban gas pipeline dynamic peaking, resource utilization of oil field associated gas, recovery of scattered gas from remote wells, efficiency improvements for unconventional gas (like coal bed methane/biogas), and low-carbon conversion of industrial tail gas.
Q4: What core technologies are employed in the process chain?
A4: It features a three-stage process chain: molecular sieve double-tower dehydration (dew point ≤ -70℃), nitrogen-methane cascade refrigeration (optimizes energy consumption by 18%), and BOG recondensation technology (liquefaction rate over 98%).
Q5: What are the "four poles" advantages of this system?
A5: The core advantages are Extremely simple deployment (95% factory pre-installation), Extremely Intelligent Operation and Maintenance (5G IoT platform), Extremely fast response (2-4 months delivery), and Extreme Return (payback period < 24 months).
Q6: What scale of projects is this solution best suited for?
A6: It is designed as an efficient mobile solution for distributed gas source development projects processing between 1,000 and 100,000 tonnes of LNG per year.
Inquire Now!
If you have any needs, please feel free to contact me and I will be happy to serve you.

