- Mobile Medical Waste Disposal Equipment
- Centralized Medical Waste High Temperature Steam Treatment Equipment
- Animal Tissue (Residue) Treatment Equipment
- VOC Exhaust Treatment Equipment
- Desulfurization Equipment
- Skid-Mounted Liquefaction Equipment
- Purification Equipment
- Liquefaction Plant
- Truck-Mounted Skid-Mounted Liquefied Natural Gas Plants
- Non-Standard Pressure Vessel
- Natural Gas Treatment Plant Tail Gas Recovery Equipment
0102030405
China Suppliers: Factory-Ready Vehicle-Mounted Skid-Mounted LNG Plant for Efficient Natural Gas Liquefaction
Vehicle-mounted liquefaction station features
The truck-mounted liquefaction station is known for its excellent performance parameters and high flexibility. With a total floor space of about 30*45m, it can achieve a stable capacity output of 3-10 m3/day in a limited space, which is suitable for different scales of energy recovery needs. In the face of complex gas source conditions, the equipment can be flexibly equipped with pressure boosting, hydrocarbon removal, desulphurisation and other functional units to ensure that the quality of the gas source meets the standards. In terms of project construction cycle, relying on prefabricated pipeline technology, it takes only 15 days for the equipment to be in place and reassembled on site, 5 days to complete commissioning, and 20 days to put into operation, which is significantly ahead of the traditional scheme.
Floor Space Required
About 30 * 45 m
Stable Capacity Output
3 - 10 m³/day
Total Installation Time
20 Days to Operation
Vehicle-mounted liquefaction station arrangement
Vehicle-mounted skid-mounted liquefied natural gas process flow diagram
Core advantage
The equipment takes modular assembly as its core advantage, giving it great mobility and adaptability. Whether it is a temporary gas test, test mining operation, or an emergency gas recovery scenario, it can be deployed quickly in response. It is especially suitable for projects that are difficult to be covered by traditional facilities, such as scattered gas fields, remote oil and gas wells, and evaluation wells, etc., which can help energy companies to solve the resource development problems and create higher economic benefits and environmental values.
Each pry block diagram

Dehydration pry block

Process Unit Diagram

Pre cooling unit pry

Main cooling unit pry

Cold box pry
Frequently Asked Questions (FAQ)
1. What is the daily capacity of the vehicle-mounted liquefaction station?
The station can achieve a stable and reliable capacity output of 3 to 10 m³ per day, making it ideal for various scales of energy recovery.
2. How much floor space does the truck-mounted liquefaction station require?
It requires a very compact space, with a total footprint of approximately 30 by 45 meters.
3. What is the deployment and commissioning timeline?
Thanks to prefabricated pipeline technology, the equipment takes only 15 days to reassemble on site, 5 days to complete commissioning, and is ready to put into operation in just 20 days.
4. Can the station adapt to complex or non-standard gas sources?
Yes. The equipment can be flexibly configured with pressure boosting, hydrocarbon removal, desulphurisation, and other functional units to guarantee that the gas quality meets standard requirements.
5. What are the primary application scenarios for this equipment?
It is highly suitable for temporary gas tests, test mining operations, emergency gas recovery, as well as remote oil and gas wells, scattered gas fields, and evaluation wells.
6. What is the core advantage of this skid-mounted LNG system?
Its core advantage is its modular assembly, which provides outstanding mobility, rapid on-site deployment, and high adaptability to challenging environments.
Inquire Now!
If you have any needs, please feel free to contact me and I will be happy to serve you.