- Mobile Medical Waste Disposal Equipment
- Centralized Medical Waste High Temperature Steam Treatment Equipment
- Animal Tissue (Residue) Treatment Equipment
- VOC Exhaust Treatment Equipment
- Desulfurization Equipment
- Skid-Mounted Liquefaction Equipment
- Purification Equipment
- Liquefaction Plant
- Truck-Mounted Skid-Mounted Liquefied Natural Gas Plants
- Non-Standard Pressure Vessel
- Natural Gas Treatment Plant Tail Gas Recovery Equipment
0102030405
China Suppliers Factory: Skid-Mounted LNG Liquefaction Equipment for Natural Gas, Shale Gas, and Coal Bed Methane
detailed description
Skid-mounted natural gas liquefaction system adopts modular integration technology, integrating pre-treatment and pressure regulation, deep purification, hybrid refrigeration and liquefaction as well as intelligent storage and transportation, and the core unit is highly integrated through standardised skid blocks (12m×3m×3.5m). For the scenario of daily processing capacity of less than 30,000 cubic metres, the first compressor and cold box integrated design eliminates the on-site refrigerant pipeline connection, reducing the risk of leakage by 90%, and the overall system occupies 40% less space than traditional equipment. Through the flexible combination of 3-6 standard skids, the system can be expanded to 300,000 m3/day processing capacity, which is suitable for the development of marginal gas fields, shale gas wells and other decentralised gas sources.
The system covers five major application dimensions:
1
dynamic peaking of urban gas pipeline network;
2
resource utilisation of associated gas from oil fields;
3
recovery of scattered gas from remote gas wells;
4
efficiency improvement of unconventional gas such as coal bed methane/biogas;
5
low-carbon conversion of industrial tail gas.
The core technology adopts a three-stage process chain: molecular sieve double-tower dehydration to make the gas dew point ≤ -70℃, nitrogen-methane cascade refrigeration to optimise the energy consumption by 18%, and BOG recondensation technology to ensure the liquefaction rate of more than 98%.
core advantages
The core advantages are embodied in the ‘four poles’ characteristics:
⚡
Extremely simple deployment: factory pre-installation rate of 95%, on-site within 7 days to complete the group skid;
⚙️
Extremely Intelligent Operation and Maintenance: 5G Internet of Things (IoT) platform for remote control and energy efficiency monitoring;
⏱️
Extremely fast response: 2-4 months delivery cycle, 60% shorter than traditional model;
📈
Extreme Return: modular expansion reduces marginal cost, payback period <24 months.
Applicable to projects processing 1-100,000 tonnes of LNG per year, it has become an efficient mobile solution in the field of distributed gas source development.
Frequently Asked Questions (FAQ)
What is the modular design capacity of the skid-mounted natural gas liquefaction system?
The system is highly flexible and scalable. Through the combination of 3-6 standard skids (12m×3m×3.5m), the daily processing capacity can be expanded from under 30,000 m³ up to 300,000 m³/day, making it ideal for marginal gas fields and decentralized gas sources.
How does the integrated compressor and cold box design reduce risk?
For systems with a daily capacity under 30,000 m³, the first-of-its-kind integrated design eliminates the need for on-site refrigerant pipeline connections. This reduces the overall risk of refrigerant leakage by 90% and cuts the equipment footprint by 40% compared to traditional configurations.
What are the primary applications for this skid-mounted system?
The system covers five major application dimensions: dynamic peaking of urban gas pipeline networks, oil field associated gas utilization, recovery of scattered gas from remote wells, efficiency improvement of unconventional gas (such as coal bed methane and biogas), and low-carbon conversion of industrial tail gas.
What core technologies are used to optimize energy consumption and liquefaction rates?
The system utilizes a three-stage process chain: molecular sieve double-tower dehydration (achieving gas dew point ≤ -70℃), nitrogen-methane cascade refrigeration (optimizing energy consumption by 18%), and BOG recondensation technology to ensure a liquefaction rate exceeding 98%.
How long does it take to deploy and start operations?
Deployment is exceptionally fast. The factory pre-installation rate reaches 95%, allowing the group skid to be completed on-site within just 7 days. The overall delivery cycle is 2-4 months, which is 60% shorter than traditional models.
What is the typical payback period for this LNG system?
Due to modular expansion reducing marginal costs and rapid deployment times, the investment payback period for projects processing 1-100,000 tonnes of LNG per year is typically less than 24 months.
Inquire Now!
If you have any needs, please feel free to contact me and I will be happy to serve you.

